Suzuki Burgman 400 - Service manual > Charging System
- Schematic and Routing Diagram
- Generator Coil Resistance Inspection
- Generator Removal and Installation
- Battery Recharging
See also:
Suzuki Burgman 400 - Service manual > Turn Signal / Side-stand Relay Removal and Installation
Refer to "Electrical Components Location". Removal 1) Remove the meter panel. Refer to "Meter Panel Removal and Installation". 2) Remove the turn signal/side-stand relay (1).
Suzuki Burgman 400 - Service manual > Schematic and Routing Diagram
Charging System Diagram Component Location